Project - West Gate Bridge
Membrane Removal using Ultra High Pressure Water

Note: To view these videos you will need Flash Player 7

 
View Video 1 - [ Broadband ] [ Dial Up ]

 
View Video 2 - [ Broadband ] [ Dial Up ]

Project Date: December 2004
Project Manager: Jonathan Sweet
Project Location: West Gate Bridge Melbourne
Client: Boral Asphalt
 
Introduction: Barry Bros. Specialised Services were contracted by Boral Asphalt to remove the membrane that bonds the roadway to the steel deck. This was undertaken by using a combination of Ultra High Pressure Water and automated High Pressure Water. The Standard of clean was critical to the new membrane and was inspected daily by Vic Roads engineering department.     

Gallery: Click here to view all the images enlarged
 
   
   
       
       

Equipment:
> 170hp 2800 bar Water Jetting Unit
> 450 hp 1000 bar Water Jetting Unit
> Vacuum Eduction Unit x 2
> Ultra High Pressure Floor Cleaner
> Automated Rotary Joint Cleaner
 

Problem: Every year Vic Roads tenders section of road surface that needs resurfacing due to excessive drumming and the potential for the bitumen to deteriorate.

 

Solution: Remove bitumen by mechanical means then remove membrane using Ultra High Pressure water.