Secure Login Area

 
Back to Secure Login Index  
 
Project - Adelaide Aquatic Centre Floor Preparation

Project Date: February/March 2005

Project Manager: Jonathan Sweet

Project Location: Adelaide Aquatic Centre

Client: Adelaide City Council
 

Introduction: Removal of failed rubber flooring and preparation of floor surface for tiling.


Image Gallery: Click here to view enlarged images
 
   
   
   
       
   
         
     
         

Equipment:
> 170 hp Ultra High Jetting Pump
> Vacuum Unit
> Ultra High Floor Cleaner
 

Problem: Over the years the flooring at the centre had been patched up by adding extra layers of non slip rubber flooring at a huge cost. The aesthetics of the centre were very poor and the state of the floor was becoming a potential OH&S issue.

 

Solution: Remove rubber flooring and tile the entire surface.

 

Back to Secure Login Index
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Get macromedia Flash Player  

 

Email Us | Terms & Conditions | Copyright | Privacy Statement | Site Map | Email Webmaster